On 13 November 2026, Chennai Metro Rail Limited (CMRL) achieved a major engineering breakthrough on Phase 2 Corridor 5 (Madhavaram–Sholinganallur) with the completion of a 1.08-km tunnelled section from Kolathur to the north shaft of Srinivasa Nagar station. Deployed by Tata Projects under Japan International Cooperation Agency (JICA) funding, TBM Kurinji overcame complex subsurface geology, a tight 230-metre curve radius, and dense urban infrastructure including active borewells and open wells. Corridor 5 spans 47 km in total, comprising 41.2 km of elevated viaduct and a 5.8-km underground section with five stations and two ramps.
News by Rahul Yelligetti.