Current Date: 02 Oct, 2026

Building Delhi's Future: The Completion of Barapullah Nallah Phase-III

The Barapullah Nallah Phase-III Elevated Road Project establishes a critical transport link between Mayur Vihar Phase-I and Sarai Kale Khan, substantially enhancing Delhi's urban infrastructure. Designed as a four-lane dual carriageway, the corridor streamlines cross-river transit between East and South Delhi.

Throughout development, RITES provided comprehensive consultancy services—encompassing independent engineering inspections, material testing, and rigorous quality-control protocols. The complex construction scope featured extensive structural execution, utilizing approximately 86,000 meters of bored cast-in-situ RCC piles and 137,000 cubic meters of reinforced cement concrete. The successful completion of this project underscores exceptional capabilities in navigating the logistical and engineering challenges of high-density metropolitan infrastructure development.

 

News by Rahul Yelligetti.

 

Share

Source : projxnews